Analyzing the interactions among delay factors in construction projects: A multi criteria decision analysis

Authors

  • Saibal Kumar Saha CHRIST University, Bangalore, India
  • Anchal Patil International Management Institute New Delhi, India
  • Ashish Dwivedi Jindal Global Business School, OP Jindal Global University, India
  • Dragan Pamucar Department of Computer Science and Mathematics, Lebanese American University, Byblos 1102 2801, Lebanon
  • Aparna S. Pillai CHRIST University, Bangalore, India

DOI:

https://doi.org/10.31181/rme040116112023s

Keywords:

Construction, Project, Site Management, Delay Factors, TISM, MICMAC

Abstract

The construction industry is a crucial sector that drives economic growth and facilitates socio-economic development. However, construction projects often get delayed due to multiple controllable and uncontrollable circumstances. In this scenario, the construction industry is striving for potential solutions to resolve project delays. Thus, the present study objectives to analyze the delay factors that affect the timely accomplishment of construction projects in the context of emerging economies. The study adopts a mixed methodology comprising of Delphi, Total Interpretive Structural Modelling (TISM) and Matrice d' Impacts Croises Multiplication Applique a Classement (MICMAC) method to model the identified delay factors. A Delphi analysis was conducted to finalize the most crucial delay factors to the on-time completion of building projects. The causal relationships and expert interpretations for each identified delay factor were then determined using multi-criteria decision analysis, TISM and MICMAC analysis. The study results highlight that lack of knowledge of newer construction methodologies and lack of project monitoring tools and techniques are positioned at the bottom level of model, which suggests that this delay factor influences others. The study results will help managers resolve the issues of project delays by selecting the most suitable approach. The findings from the study suggest adopting advanced technologies for effective communication, use of analytical tools for resource allocation and waste-scrapping approaches for eliminating delays in construction projects.

References

Abd El-Razek, M. E., Bassioni, H. A., & Mobarak, A. M. (2008). Causes of delay in building construction projects in Egypt. Journal of construction engineering and management, 134(11), 831-841.

Alinaitwe, H., Apolot, R., & Tindiwensi, D. (2013). Investigation into the causes of delays and cost overruns in Uganda's public sector construction projects. Journal of Construction in Developing Countries, 18(2), 33.

Annamalaisami, C. D., & Kuppuswamy, A. (2022). Reckoning construction cost overruns in building projects through methodological consequences. International Journal of Construction Management, 22(6), 1079-1089.

Arantes, A., & Ferreira, L. M. D. (2020). Underlying causes and mitigation measures of delays in construction projects: An empirical study. Journal of Financial Management of Property and Construction, 25(2), 165-181.

Aregay, H. (2022). Causes of Project Delays in Grade One Construction Companies: The Case of Yotek Addis Ababa (Doctoral dissertation, ST. MARY’S UNIVERSITY).

Assaf, S. A., & Al-Hejji, S. (2006). Causes of delay in large construction projects. International journal of project management, 24(4), 349-357.

Bagrecha, M. K., & Bais, M. A. (2017). Study on delay construction project in India. International Journal of Innovations in Engineering Research and Technology, 4(11), 1-5.

Bashir, H., Ojiako, U., & Mota, C. (2020). Modeling and analyzing factors affecting project delays using an integrated social network-fuzzy MICMAC approach. Engineering Management Journal, 32(1), 26-36.

Bhanot, N., Rao, P. V., & Deshmukh, S. G. (2017). An integrated approach for analysing the enablers and barriers of sustainable manufacturing. Journal of cleaner production, 142, 4412-4439.

Bhatti, S., Haider, F., & Siddiqui, U. A. (2022). Construction Delays and Project Failures due to the Biological Pandemic of COVID-19 and Lockdown Effects. Sir Syed University Research Journal of Engineering & Technology, 12(1), 64-69.

Choudhury, A., Behl, A., Sheorey, P. A., & Pal, A. (2021). Digital supply chain to unlock new agility: a TISM approach. Benchmarking: An International Journal, 28(6), 2075-2109.

Dağıstanlı, H. A. (2023). An Interval-Valued Intuitionistic Fuzzy VIKOR Approach for R&D Project Selection in Defense Industry Investment Decisions. Journal of Soft Computing and Decision Analytics, 2(1). https://doi.org/10.31181/jscda21202428

Doloi, H., Sawhney, A., Iyer, K. C., & Rentala, S. (2012). Analysing factors affecting delays in Indian construction projects. International journal of project management, 30(4), 479-489.

Dwivedi, A., Agrawal, D., Jha, A., & Mathiyazhagan, K. (2023). Studying the interactions among Industry 5.0 and circular supply chain: Towards attaining sustainable development. Computers & Industrial Engineering, 176, 108927.

Edison, J. C., & Singla, H. K. (2020). Development of a scale for factors causing delays in infrastructure projects in India. Construction Economics and Building, 20(1), 36-55.

Faridi, A. S., & El‐Sayegh, S. M. (2006). Significant factors causing delay in the UAE construction industry. Construction management and economics, 24(11), 1167-1176.

Ghadimi, P., O'Neill, S., Wang, C., & Sutherland, J. W. (2021). Analysis of enablers on the successful implementation of green manufacturing for Irish SMEs. Journal of Manufacturing Technology Management, 32(1), 85-109.

GIZAW, Y. (2021). Assessment on the Causes of Project Delay in Building Construction Projects; The Case For Ethiopian Construction Works Corporation (Doctoral dissertation, ST. MARY’S UNIVERSITY).

Głuszak, M., & Leśniak, A. (2015). Construction delays in clients opinion–multivariate statistical analysis. Procedia engineering, 123, 182-189.

Goers, J., & Horton, G. (2023). Project selection in a biotechnology startup using combinatorial acceptability analysis. Decision Making: Applications in Management and Engineering, 6(2), 828–852. https://doi.org/10.31181/dmame622023783

Haseeb, M., Bibi, A., & Rabbani, W. (2011). Problems of projects and effects of delays in the construction industry of Pakistan. Australian journal of business and management research, 1(5), 41-50.

Islam, M. S., & Trigunarsyah, B. (2017). Construction delays in developing countries: a review. Journal of Construction Engineering and Project Management, 7(1), 1-12.

Khahro, S. H., & Memon, Z. A. (2018). Non excusable delays in construction industry: A causal study. Engineering, Technology & Applied Science Research, 8(6), 3561-3564.

Khan, R. A., & Gul, W. (2017, September). Emperical study of critical risk factors causing delays in construction projects. In 2017 9th IEEE International Conference on Intelligent Data Acquisition and Advanced Computing Systems: Technology and Applications (IDAACS) (Vol. 2, pp. 900-906). IEEE.

Lingard, H., Cooke, T., Zelic, G., & Harley, J. (2021). A qualitative analysis of crane safety incident causation in the Australian construction industry. Safety Science, 133, 105028.

Love, P. E., Mandal, P., & Li, H. (1999). Determining the causal structure of rework influences in construction. Construction Management & Economics, 17(4), 505-517.

Mahamid, I., & Bruland, A. (2012). Cost deviation in road construction projects: The case of Palestine. Australasian Journal of Construction Economics and Building, The, 12(1), 58-71.

Mali, M. L., & Warudkar, M. A. (2016). Causes of delay in the construction industry in Pune region of India. Journal of Management. In Engineering, 11(2), 45-50.

Mardiani, G. T. (2018, August). Construction industry project planning information system. In IOP Conference Series: Materials Science and Engineering (Vol. 407, No. 1, p. 012093). IOP Publishing.

Muneeswaran, G., Manoharan, P., Awoyera, P. O., & Adesina, A. (2020). A statistical approach to assess the schedule delays and risks in Indian construction industry. International Journal of Construction Management, 20(5), 450-461.

Musa, S., Marshall-Ponting, A., Nifa, F. A. A., & Shahron, S. A. (2018, September). Building information modeling (BIM) in Malaysian construction industry: Benefits and future challenges. In AIP Conference Proceedings (Vol. 2016, No. 1). AIP Publishing.

Padroth, C., Davis, P. R., & Morrissey, M. (2017). Contract information asymmetry: Legal disconnect within the project team. Journal of legal affairs and dispute resolution in engineering and construction, 9(3), 04517015.

Pamucar, D., Sarkar, B. D., Shardeo, V., Soni, T. K., & Dwivedi, A. (2023). An integrated interval programming and input–output knowledge model for risk and resiliency management. Decision Analytics Journal, 9, 100317.

Patil, A., Madaan, J., Chan, F. T., & Charan, P. (2022). Advancement of performance measurement system in the humanitarian supply chain. Expert Systems with Applications, 206, 117844.

Patil, A., Shardeo, V., & Madaan, J. (2021). Modelling performance measurement barriers of humanitarian supply chain. International journal of productivity and performance management, 70(8), 1972-2000.

Patil, A., Shardeo, V., Dwivedi, A., Moktadir, M. A., & Bag, S. (2023). Examining the interactions among smart supply chains and carbon reduction strategies: To attain carbon neutrality. Business Strategy and the Environment.

Ratajczak, J., Riedl, M., & Matt, D. T. (2019). BIM-based and AR application combined with location-based management system for the improvement of the construction performance. Buildings, 9(5), 118.

Razia, B., Thurairajah, N., & Larkham, P. (2017). Understanding delays in construction in conflict zones. WELCOME TO DELEGATES IRC 2017, 844.

Rivera, A., Le, N., Kashiwagi, J., & Kashiwagi, D. (2016). Identifying the global performance of the construction industry. Journal for the Advancement of Performance Information & Value, 8(2), 7-19.

Sahoo, S. K., & Goswami, S. S. (2023). A Comprehensive Review of Multiple Criteria Decision-Making (MCDM) Methods: Advancements, Applications, and Future Directions. Decision Making Advances, 1(1), 25–48. https://doi.org/10.31181/dma1120237

Salunkhe, A. A., & Patil, R. S. (2014). Effect of construction delays on project time overrun: Indian scenario. Int. J. Res. Eng. Technol, 3(1), 543-547.

Sambasivan, M., & Soon, Y. W. (2007). Causes and effects of delays in Malaysian construction industry. International Journal of project management, 25(5), 517-526.

Sanni-Anibire, M. O., Mohamad Zin, R., & Olatunji, S. O. (2022). Causes of delay in the global construction industry: a meta analytical review. International Journal of Construction Management, 22(8), 1395-1407.

Senesi, C., Javernick-Will, A., & Molenaar, K. R. (2015). Benefits and barriers to applying probabilistic risk analysis on engineering and construction projects. Engineering Management Journal, 27(2), 49-57.

Shrivas, A., & Singla, H. K. (2022). Analysis of interaction among the factors affecting delay in construction projects using interpretive structural modelling approach. International Journal of Construction Management, 22(8), 1455-1463.

Singh, A., Dwivedi, A., Agrawal, D., & Chauhan, A. (2023). A framework to model the performance indicators of resilient construction supply chain: An effort toward attaining sustainability and circular practices. Business Strategy and the Environment.

Sushil, & Dinesh, K. K. (2022). Structured literature review with TISM leading to an argumentation based conceptual model. Global Journal of Flexible Systems Management, 23(3), 387-407.

Sushil. (2012). Interpreting the interpretive structural model. Global Journal of Flexible Systems Management, 13, 87-106.

Sushil. (2017). Modified ISM/TISM process with simultaneous transitivity checks for reducing direct pair comparisons. Global Journal of Flexible Systems Management, 18(4), 331-351.

Tafazzoli, M., & Shrestha, P. P. (2017). Investigating Causes of Delay in US Construction Projects.

Toor, S. U. R., & Ogunlana, S. O. (2008). Problems causing delays in major construction projects in Thailand. Construction management and economics, 26(4), 395-408.

Trauner, T. J. (2009). Construction delays: Understanding them clearly, analyzing them correctly. Butterworth-Heinemann.

Tripathi, M., & Hasan, Z. (2023). Can leaders power and influence strategy enhance knowledge management in research intensive organizations: a modified TISM approach. Quality & Quantity, 57(5), 4725-4758.

Tumi, S. A. H., Omran, A., & Pakir, A. H. K. (2009, November). Causes of delay in construction industry in Libya. In The International Conference on Economics and Administration (pp. 265-272).

Umar, A. A., Rizeiqi, R. K. A., & Badr, A. (2020). Major causes assessment of construction delays. Journal of engineering, project, and production management, 10(3), 179-186.

Venkatesh, M. P., Renuka, S. M., & Umarani, C. (2012). Causes of delay in Indian construction industry. Applied mechanics and materials, 174, 2768-2773.

Verma, A., Tripathy, S., & Singhal, D. (2023). The significance of warehouse management in supply chain: An ISM approach. Decision Making: Applications in Management and Engineering, 6(1), 92–110. https://doi.org/10.31181/dmame0321052022v

Yousri, E., Sayed, A. E. B., Farag, M. A., & Abdelalim, A. M. (2023). Risk Identification of Building Construction Projects in Egypt. Buildings, 13(4), 1084.

Zheng, Y. (2023). Deployment and Implementation of IFS System Procurement Management Module of Road Network Company. Journal of Soft Computing and Decision Analytics, 1(1), 283-302. https://doi.org/10.31181/jscda11202325

Published

2023-11-17

How to Cite

Analyzing the interactions among delay factors in construction projects: A multi criteria decision analysis. (2023). Reports in Mechanical Engineering, 4(1), 241-255. https://doi.org/10.31181/rme040116112023s